System
NOSEDO WWTP
Caprari's proposal
No. 75 Sewage pumps K+ series - P2 = 2,2-25 kW

The sewage plant covers a surface area of 40,000 sq m and has a sewage treatment capacity of 432,000 m3/day, equivalent to about 18,000 m3/hour in dry weather and about 54,000 m3/hour in rainy conditions. Three types of sewage flow treatments are performed: pre-treatment, biological treatment, tertiary and disinfection treatment. Caprari’s contribution includes the supply of 75 submersible electric pumps in 16 different models, chosen to suit the technical characteristics required and with power ratings ranging from 1.2 to 25 kW. Besides guaranteed delivery times, Caprari ensures product quality and reliability over time. In addition, it provides maintenance according to the FULL SERVICE system.