General Industry

Australia

System
Pontoon Water Distribution
Caprari's proposal
A Queensland coal mine required a pontoon mounted vertical turbine pump for general water usage around mine site
Caprari was able to provide a 200kW high efficiency P series vertical line shaft turbine in a short 3-week lead time requirement.
 
Advantages achieved
During peak times Caprari’s turbine was used to distribute water to various areas of the mine including dust suppression and wash down plant from a tailings dam