System
CIPUTRA Project
Prior situation
We have collaborated with the Construction and Engineering Agency for the new project design.
Caprari's proposal
KC150, KC100 and KC80
 
Advantages achieved
We have been chosen over the competition thanks to our reliable NON STOP system and micro-casting sturdy impeller and body design which would reduce drastically the cost of maintenance.