Infrastructure

Regno Unito

System
Adoptable Pumping Station
Prior situation
The transformation of a large unused space of land in Biggleswade to form new industrial units for various commercial businesses. The drainage on site for the foul waste water led to an invert level of around 6m from the cover level meaning a pumped solution would be required.
Caprari's proposal
Caprari designed and worked with Morgan Sindall infrastruture to install a brand new adoptable pumping station to Anglian Water’s specification with the install of two caprari KC submersible sewage pumps as well as all pipework valves, electrical control panel and associated items.
 
Advantages achieved
The pumping station was installed and ready for the first occupancies of industrial units with Anglian Water telemetry to warn of any potential issues.