NAVAS DE ORO WASTE WATER TREATMENT PLANT (SEGOVIA)
Caprari's proposal
The system includes various treatments for sewage in processes where our electric pumps can be used, amongst which: Sludge return
Sludge and foam emptying
Aeration and mixing
The purifier operates in a residential area (3.624 EQUIVALENT INHABITANTS)
No.13 (thirteen) electric pumps for a total 310 kW installed.