Plan Vale de Moura – Evora
Portugal
Irrigation
Initial situation
Construction of a new irrigation system for 800 hectares of almond tree cultivation.
Caprari proposal
5 base-mounted units consisting of standardised NCH series pumps of 250 kW each.
Benefits obtained
Construction of a modern and efficient irrigation pumping station: the “Vale de Moura”_Évora pumping station with a sufficient capacity to irrigate 800 hectares of almond trees.
Thanks to the quality and efficiency of the products chosen, the new system, built with standard pumps, provides for a total flow rate of over 2,000 m3/h and a head of 85 mWC per pump.
The pre- and post-sales support that the Caprari network was able to provide the customer also played a decisive role.
相关项目

Plan Vale de Moura – Portugal – Irrigation

La Clarita – Uruguay – Extensive irrigation

草皮生产系统 – 英国 – 灌溉

牛油果种植 – 秘鲁 – 中心支轴式灌溉

从大坝取水并输水 – 澳大利亚 – 引水

苏格兰超级联赛足球俱乐部 – 英国 – 足球场灌溉

水处理系统 – 越南 – 用于灌溉的水处理

灌溉系统 – 西班牙 – 自走式灌溉供水










