Real Guadalhorce Club de Golf
Spain
Golf course irrigation
Исходная ситуация
The system, now insufficient for the area to be irrigated, encountered energy efficiency and poor performance issues.
Решение Caprari
No. 3 vertical lineshaft units for a total of 111 kW.
Полученные преимущества
Thanks to the replacement of the old pumps with 3 Caprari vertical lineshaft units, the problem of energy efficiency and performance has been resolved: the power originally installed was over 170 kW, and the Caprari solution has reduced the power to 111 kW, while providing the same performance as the previous units.
This modernisation operation allows for greater energy savings, while at the same time guaranteeing excellent pumping performance.
Связанные проекты

Plant Copenhagen metro — Denmark — Construction site drainage

Plant Alicante airport — Spain — Waste water treatment

Plant pacific islands — Australia — Fire-fighting

Real Guadalhorce Club de Golf — Spain — Golf course irrigation

Magdalena palace

СТАНЦИЯ ГАРДОНЕ / ФОЛ

ФОНТАН ТРЕВИ

Западный железнодорожный вокзал Chongqing

Pozzoli

СТАНЦИЯ BIGGLESWADE

Drosendorf

Vilseck
Могу я чем-нибудь помочь?
Часто задаваемые вопросы
Наиболее часто задаваемые вопросы и ответы на них в одном месте.
Услуги
Найдите оптимальное решение с помощью нашего предпродажного обслуживания.
Хотите узнать больше о продукции?
Наша команда в вашем полном распоряжении.











