Plant Copenhagen metro
Denmark
Construction site drainage
Исходная ситуация
For the construction of the new metro station in AARSLEFF Square in the heart of Copenhagen, a major drainage project needed to be undertaken.
Due to the proximity to the sea and the geological characteristics of the area, it was necessary to maintain a constant groundwater level
Решение Caprari
60 submerged electric pumps were supplied
Полученные преимущества
These pumps will operate 24 hours a day for the entire duration of the construction project (several years).
There are several advantages to using these pumps:
- ultra-resistance to sand,
- improved efficiency
- reduction in electricity costs.
The new submerged pumps for small and medium-sized wells are CAPRARI’s solution to the need to combine high performance with long life in extremely harsh operating conditions. Compact and rustproof, they combine power and reliability as a result of the quality materials used and the innovative solutions adopted.
Thanks to numerous patented solutions, they guarantee high performance and savings over time.
Связанные проекты

Promotor ADIF

BOMBEO PRINCIPAL DE RIEGO CAMPO DE GOLF MIJAS GOLF

EL CHAPARRAL GOLF CLUB (Mijas-Málaga)

Plant Copenhagen metro — Denmark — Construction site drainage

Plant Alicante airport — Spain — Waste water treatment

Plant pacific islands — Australia — Fire-fighting

Real Guadalhorce Club de Golf — Spain — Golf course irrigation

Magdalena palace

СТАНЦИЯ ГАРДОНЕ / ФОЛ

ФОНТАН ТРЕВИ

Западный железнодорожный вокзал Chongqing

Pozzoli

СТАНЦИЯ BIGGLESWADE

Drosendorf

Vilseck
Могу я чем-нибудь помочь?
Часто задаваемые вопросы
Наиболее часто задаваемые вопросы и ответы на них в одном месте.
Услуги
Найдите оптимальное решение с помощью нашего предпродажного обслуживания.
Хотите узнать больше о продукции?
Наша команда в вашем полном распоряжении.