Real Guadalhorce Club de Golf
Spain
Golf course irrigation
Prior situation
The system, now insufficient for the area to be irrigated, encountered energy efficiency and poor performance issues.
Caprari solution
No. 3 vertical lineshaft units for a total of 111 kW.
Benefit obtained
Thanks to the replacement of the old pumps with 3 Caprari vertical lineshaft units, the problem of energy efficiency and performance has been resolved: the power originally installed was over 170 kW, and the Caprari solution has reduced the power to 111 kW, while providing the same performance as the previous units.
This modernisation operation allows for greater energy savings, while at the same time guaranteeing excellent pumping performance.
Related Projects
Real Guadalhorce Club de Golf – Spain – Golf course irrigation
Magdalena palace – Spain – Sea water treatment
Gardonè Plant / Fol – Italy – Water boosting and distribution
Trevi Fountain – Italy – Water supply
Chongqing Railway Station – China – HVAC water recirculation
Pozzoli Depuration – Italy – Rainwater collection
Biggleswade plant – United Kingdom – Adoptable Pumping Station
Drosendorf Plant – Germany – Flood control in Drosendorf
Vilseck Plant – Germany – Wastewater treatment
How can I help you?
Faq
Find the right solution for you through our pre-sale service
Services
Find the right solution for you through our pre-sale service
Want to know more about available products?
Our team is here to help.