Real Guadalhorce Club de Golf

Spain

Golf course irrigation

Prior situation

The system, now insufficient for the area to be irrigated, encountered energy efficiency and poor performance issues.

Caprari solution

No. 3 vertical lineshaft units for a total of 111 kW.

Benefit obtained

Thanks to the replacement of the old pumps with 3 Caprari vertical lineshaft units, the problem of energy efficiency and performance has been resolved: the power originally installed was over 170 kW, and the Caprari solution has reduced the power to 111 kW, while providing the same performance as the previous units.
This modernisation operation allows for greater energy savings, while at the same time guaranteeing excellent pumping performance.

Related Projects

Real Guadalhorce Club de Golf – Spain – Golf course irrigation

Real Guadalhorce Club de Golf – Spain – Golf course irrigation

Magdalena palace – Spain – Sea water treatment

Magdalena palace – Spain – Sea water treatment

Gardonè Plant / Fol – Italy – Water boosting and distribution

Gardonè Plant / Fol – Italy – Water boosting and distribution

Trevi Fountain – Italy – Water supply

Trevi Fountain – Italy – Water supply

Chongqing Railway Station – China – HVAC water recirculation

Chongqing Railway Station – China – HVAC water recirculation

Pozzoli Depuration – Italy – Rainwater collection

Pozzoli Depuration – Italy – Rainwater collection

Biggleswade plant – United Kingdom – Adoptable Pumping Station

Biggleswade plant – United Kingdom – Adoptable Pumping Station

Drosendorf Plant – Germany – Flood control in Drosendorf

Drosendorf Plant – Germany – Flood control in Drosendorf

Vilseck Plant – Germany – Wastewater treatment

Vilseck Plant – Germany – Wastewater treatment

How can I help you?

Faq

Find the right solution for you through our pre-sale service

Services

Find the right solution for you through our pre-sale service

Want to know more about available products?

Our team is here to help.