Plant Copenhagen metro
Denmark
Construction site drainage
Исходная ситуация
For the construction of the new metro station in AARSLEFF Square in the heart of Copenhagen, a major drainage project needed to be undertaken.
Due to the proximity to the sea and the geological characteristics of the area, it was necessary to maintain a constant groundwater level
Решение Caprari
60 submerged electric pumps were supplied
Полученные преимущества
These pumps will operate 24 hours a day for the entire duration of the construction project (several years).
There are several advantages to using these pumps:
- ultra-resistance to sand,
- improved efficiency
- reduction in electricity costs.
The new submerged pumps for small and medium-sized wells are CAPRARI’s solution to the need to combine high performance with long life in extremely harsh operating conditions. Compact and rustproof, they combine power and reliability as a result of the quality materials used and the innovative solutions adopted.
Thanks to numerous patented solutions, they guarantee high performance and savings over time.
Связанные проекты

Plant Copenhagen metro — Denmark — Construction site drainage

Plant Alicante airport — Spain — Waste water treatment

Plant pacific islands — Australia — Fire-fighting

Real Guadalhorce Club de Golf — Spain — Golf course irrigation

Magdalena palace

СТАНЦИЯ ГАРДОНЕ / ФОЛ

ФОНТАН ТРЕВИ

Западный железнодорожный вокзал Chongqing

Pozzoli

СТАНЦИЯ BIGGLESWADE

Drosendorf

Vilseck
Могу я чем-нибудь помочь?
Часто задаваемые вопросы
Наиболее часто задаваемые вопросы и ответы на них в одном месте.
Услуги
Найдите оптимальное решение с помощью нашего предпродажного обслуживания.
Хотите узнать больше о продукции?
Наша команда в вашем полном распоряжении.





