FINCA HORTALIZAS LOS CARRIZALES (ELCHE)
AGRICULTURE SECTOR
The project includes the supply and installation of four base-mounted electric pumps equipped with high-efficiency IE3 motors, designed to improve water distribution and management within the agricultural operation.
BENEFITS ACHIEVED
The system is completed by four three-phase auxiliary units, ensuring increased operational reliability, energy optimization, and continuity of irrigation service.
مشاريع ذات صلة

Segura
Segura

HIDROMATIC PONENT para Finca Almacín
HIDROMATIC PONENT para Finca Almacín

CC.RR. LA TORRETA (PEAL DE BECERRO)
CC.RR. LA TORRETA (PEAL DE BECERRO)

AGRISAN RIEGOS
AGRISAN RIEGOS

REGS DEL SEGRÀ
REGS DEL SEGRÀ

FINCA HORTALIZAS LOS CARRIZALES (ELCHE)
FINCA HORTALIZAS LOS CARRIZALES (ELCHE)

RIEGOS LEVANTE HELLIN
RIEGOS LEVANTE HELLIN

Plan Vale de Moura – البرتغال – الري
Plan Vale de Moura – البرتغال – الري

La Clarita – أوروجواي – الري الواسع النطاق
La Clarita – أوروجواي – الري الواسع النطاق

مصنع إنتاج لفائف العشب – المملكة المتحدة – الري
مصنع إنتاج لفائف العشب – المملكة المتحدة – الري

زراعة الأفوكادو – بيرو – الري
زراعة الأفوكادو – بيرو – الري

مصنع الثروة الحيوانية – أستراليا – سحب المياه
مصنع الثروة الحيوانية – أستراليا – سحب المياه

المجال الرياضي – المملكة المتحدة – ري الملاعب
المجال الرياضي – المملكة المتحدة – ري الملاعب

مقاطعة هانوي – فيتنام – معالجة المياه للري
مقاطعة هانوي – فيتنام – معالجة المياه للري

بيدرولا – إسبانيا – التغذية ذاتية الدفع للري
بيدرولا – إسبانيا – التغذية ذاتية الدفع للري
كيف يمكنني مساعدتك
الأسئلة الشائعة
الأسئلة الأكثر شيوعاً وإجاباتها في موقع واحد
الخدمات
ابحث عن الحل المناسب لك من خلال خدمة ما قبل البيع لدينا
هل ترغب في معرفة المزيد عن المنتجات؟
فريقنا تحت تصرفك تماماً







