Ilesha Dam
Nigeria
Water Supply
Prior situation
Design and construction of a new project
Caprari solution
No.5 Vertical Lineshaft pumps (equipped with 250kW electric motors)
Control panel
Benefits obtained
Caprari designed an appropriate solution to fulfill the technical requirements given by the Federal Ministry of Water Resources. The pumps are installed in the “Sediment Removal Basin” and are operated by a single special control panel. One of the main problems was that of being able to trust in continued operation in an environment which presented both high temperatures and humidity. Therefore, we designed a panel with an automatic regulation of relative humidity by means of hygrostats to ensure that the pumps could be relied upon to continue functioning.