Ilesha Dam

Nigeria

Water Supply

Prior situation

Design and construction of a new project

Caprari solution

No.5 Vertical Lineshaft pumps (equipped with 250kW electric motors)
Control panel

Benefits obtained

Caprari designed an appropriate solution to fulfill the technical requirements given by the Federal Ministry of Water Resources. The pumps are installed in the “Sediment Removal Basin” and are operated by a single special control panel. One of the main problems was that of being able to trust in continued operation in an environment which presented both high temperatures and humidity. Therefore, we designed a panel with an automatic regulation of relative humidity by means of hygrostats to ensure that the pumps could be relied upon to continue functioning.

How can I help you?

Faq

Frequently asked questions and relevant responses all in one place

Services

Find the right solution for you through our pre-sale service

Want to know more about available products?

Our team is here to help.