Gardonè Plant / Fol

Italy

Water boosting and distribution

Prior situation

The prior situation presented a range of issues linked to the plant’s age and reduced capacity.

Caprari solution

No.4 450kW high pressure horizontal shaft pumps
No.1 355kW high pressure horizontal shaft pump
total kW installed: 2,155kW

Benefits obtained

Expansion of the station and replacement of the existing pumps. Additionally, a new plant was designed from scratch. The advantages obtained by the client in considering us the best solution from a technical and economic point of view (thanks to our work) can be summarised as follows:

  • better performance from the machines with improved efficiency and consequent energy savings

How can I help you?

Faq

Frequently asked questions and relevant responses all in one place

Services

Find the right solution for you through our pre-sale service

Want to know more about available products?

Our team is here to help.