Topley Pike Mine

United Kingdom

Quarry Dewatering

Prior situation

The plant needed to be modified due to problems relating to unplanned maintenance and failures. Moreover, there was a need to improve the general operational efficiency of the plant, the existing pumps of which were powered by a diesel generator. Sites had been experiencing high failure rates with expensive repair costs – plans to increase flow rate and remain operational throughout the year had been proposed. The size of the submersibles required a NPSH of 3-4 metres positive inlet pressure, which could only be achieved by lowering the pumps to a submerged position that drew rocks and heavy solids up from the bottom of the bed. By using the pumps above this level, cavitation was being experienced.

Caprari solution

A solution was required to reduce downtime/maintenance costs and expensive failures. When a conventional submersible motor fails, it is not always economically to repair the motor when compared to the cost of buying a new pump.

Rather than replacing the old pump for a new one, a policy to look at reducing overall LCC at the site was implemented, reducing obsolescence from scrap and improving efficiency to allow the plant to be more flexible.

Benefit obtained

With Caprari’s linehsaft pump, the motor can be easily maintained above water level. The pump was able to absorb less power at higher heads, reducing overall running costs and routine maintenance costs.

Related Projects

Mina de Cobre – Spain – Mine

Mina de Cobre – Spain – Mine

Huadian chemical plant – Cina – Polymer production line

Huadian chemical plant – Cina – Polymer production line

Dayang Ouyang Platform – China – Fixing a platform to the seabed

Dayang Ouyang Platform – China – Fixing a platform to the seabed

Ski Area Xiaohai – China – Snowmaking

Ski Area Xiaohai – China – Snowmaking

Topley Pike Mine – United Kingdom – Quarry Dewatering

Topley Pike Mine – United Kingdom – Quarry Dewatering

Ski area Les Rousses – France – Snowmaking

Ski area Les Rousses – France – Snowmaking

Vang Danh Mine – Vietnam – Water treatment

Vang Danh Mine – Vietnam – Water treatment

Maari Platform – New Zealand – Fixing a platform to the seabed

Maari Platform – New Zealand – Fixing a platform to the seabed

Ski area Todtnauberg – Germany – Snowmaking

Ski area Todtnauberg – Germany – Snowmaking

Escondida Mine – Cile – Water supply

Escondida Mine – Cile – Water supply

Dairy Industry – Greece – Water collection

Dairy Industry – Greece – Water collection

Steel mils – United Kingdom – Pumps for cooling

Steel mils – United Kingdom – Pumps for cooling

Xi Mang Quang Son Cement Plant – Vietnam – Water boosting and distribution

Xi Mang Quang Son Cement Plant – Vietnam – Water boosting and distribution

Michelin plant – Germany – Raw water collection

Michelin plant – Germany – Raw water collection

Ilesha Dam – Nigeria – Water Supply

Ilesha Dam – Nigeria – Water Supply

How can I help you?

Faq

Frequently asked questions and relevant responses all in one place

Services

Find the right solution for you through our pre-sale service

Want to know more about available products?

Our team is here to help.